Guanaco

55% Cotton / 45% Viscose

Our CLASS yarn does it all. It is soft and ideal for all knitting, crochet and arts & craft projects. All colorways have a tone on tone color effect.

Weight: 100grams / 3.5oz
Approx.: 220 meters / 240 yards
Needle Size: 3 ½ to 4 ½ mm / 4 to 7 US
Gauge: 5 to 6 stitches per inch
Sport weight

This sport-weight cotton-viscose blend is delicate, fun and with a soft light sheen. Its a gorgeous extra light yarn perfect for that special spring summer project.

Please look for our ASLANTRENDS VOLUME 2 pattern book with many CLASS yarn patterns & ideas designed by Melissa Leapman, Dina Mor & Amy Polcyn.


  • #1
    WHITE

  • #18
    STONE GREY

  • #4019
    STRAW

  • #19
    BLACK

  • #3563
    MOCHA

  • #2016
    BANANA

  • #4154
    TANGERINE

  • #947
    OATMEAL

  • #8
    TOMATO

  • #3547
    DEEP ROSE

  • #4007
    PLUM

  • #1090
    BERRIES&CREAM

  • #2969
    BAHAMA BLUE

  • #332
    BLUE JAY

While these pictures provide a fairly accurate reproduction of the colours their appearance can vary from computer monitor to computer monitor

Hand wash in cold water
using mild soap, lay flat
to dry or dry clean.
With the right care
it will last forever.

ASLANTRENDS YARN RACK INSTRUCTIONS

1) box 1 = smaller square box / floor base
2) box 2 = tall thin box / lower and upper tower

Re: box 1

  • Open base box and remove all dowels inside bottom of the base. To remove, unscrew one side of cross bar.
  • Put all dowels aside / will use at the end.
  • Install all 4 wheels in each corner of base bottom. / use small screws.
  • Once you have all wheels installed put base in up right position, wheels on floor.

Re: box 2

  • Open second box and install lower portion of tower base to floor base. / use small screws.
  • Once the lower tower is secured to floor base proceed to install the top tower using the 2 provided mounted small pieces of wood.
  • Flip upward until you find matching hole by rotating top tower.
  • Once you match the hole, proceed to screw top tower with small screws.

Once full tower is secured proceed to arrange all dowels in the sequence that you like the most.

Install top sign with provided small screws (installation of top sign is optional).

Note: use provided black rubber instead of wheels if you want rack not to move.